Fukushima SFP#1 GONE After Uncovering Reactor?

What Happened to the Spent Fuel Pool in R#1 at Fukushima after TEPCO removed most of the panels last week?
Tepco Removes Cover Unit 1 Missing Spent Fuel Pool Secrecy Act Deletes Story https://youtu.be/AygHPu4J7L8
They deleted the full article was only able to catch the beginning. The spent fuel pool at unit 1 is GONE! TEPCO four days, out of the wall panel 18 sheets that make up the cover to cover the first nuclear power plant Unit 1 reactor building in Fukushima, finished the removal of the 16 th. In the framework over the cover, the whole picture of the building, which was badly damaged in a hydrogen explosion has become uncovered again. The two panels that remain to removal even during the next week, the end of the dismantling of the building cover, which began in July last year. I translated it from this Japanese website http://tinyurl.com/ze72jp6

https://youtu.be/KeYNkky3hIc Video shot from a Kyodo News airplane on Nov. 4, 2016, shows the destroyed No. 1 reactor building at the disaster-hit Fukushima Daiichi nuclear plant, after the removal of 16 of 18 panels covering the building. Tokyo Electric Power Co. plans to dismantle the remaining two panels the following week to complete the panel removal work that started in July 2015 as part of decommissioning the plant.
http://tinyurl.com/z2g84te
and
http://tinyurl.com/zoqpzmm

TEPCO Prepares for Removal of Fuel from Fukushima Daiichi Unit 1 Reactor Building http://tinyurl.com/hvb2t5s

Audio Called The Haunted Hotel by SackJo22 on ccdigmixter. http://ccmixter.org/files/SackJo22/41323